Phosphate Coating
Our state of the art 4 stage Zinc Phosphate system is designed to accommodate almost any length of parts to give the customer the corrosion resistant they are looking for.
Stage #1 – Heated Immersion Alkaline Pre-cleaning, is designed to remove all oils and soils from material prior to treatment.
Stage#2 – Heated Immersion Fresh Water Rinse, remove all soap residue prior to coating.
Stage #3- Zinc Phosphate Bath, applies the corrosion resistant to extend the life of the part.
Stage #4 – Heated Immersion Oil Bath, coats the parts with rust preventative oil.